504MW Alaoji Power Plant shutdown over pipeline vandalism

Date:

By Etuka Sunday 

TotalEnergies EP Nigeria Limited has declared a Force Majeure Event resulting from its NOPL Line vandalization at KP41 on January 7, 2022. 

According to TotalEnergies EP Nigeria Limited in a letter to the Niger Delta Power Holding Company Limited (NDPHC), “NOPL pipeline was vandalized on 7th January 2022 at KP41 Alaoma Etche Cluster. 

The Head, Communication & Public Relations, NDPHC, Emmanuel Ojor in a statement said, the Line Block Valve at KP38 was closed to isolate the sabotage point and depressurization of the line, this will affect gas supply to Alaoji (Power Plant) until further notice.  

READ MORE  Jonathan warns miscreants to stay away from Osun polls

As a result of this development, TotalEnergies EP Nigeria Limited stated that “Gas supply to Alaoji Power Plant was suspended due to this unfortunate event. Preliminary investigation to determine the extent of the damage is ongoing, and repair works shall commence as soon as feasible.”  

The Management of Niger Delta Power Holding Company (NDPHC) Limited hereby regrets to announce the shutdown of 504MW Alaoji Power Plant on January 7, 2022.  

Please recall that Omotosho NIPP was shut down last month when Nigeria Gas Company (NGC) due to system wide curtailment of all gas shippers (gas producers/off takers) by Nigeria Gas Company (NGC) “to forestall the imminent collapse of the gas grid.” 

READ MORE  Oxfam, stakeholders urge government to support women farmers

NGC said at the time that the Trans-Forcardos Pipeline (TFP), belonging to NGC was breached on December 17, 2021.     

That breach led to the deferment of about 250MMscfd of gas from the Pipeline Network, a situation that brought the Network Pressure to abysmal levels, thereby triggering an emergency.    

The curtailment impacted operations of Niger Delta Power Holding Company (NDPHC) Limited negatively with Omotosho NIPP being shut down and gas supply to GEREGU NIPP and Ihovbor NIPP also limited thus leading to part load or low generation from these available power plants.    

The Management of NDPHC hereby assures our customers that Alaoji Power Plant and others will resume power generation as soon as gas supply is restored.

READ MORE  Petroleum marketers resume loading at the depots – NMDPRA

Never miss a moment! Get the stories shaping Nigeria, delivered straight to your phone. Follow Peoplesdaily Newspaper on WhatsApp for breaking news, exclusive reports, and the headlines everyone will be talking about, before anyone else.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

Popular

More like this
Related

Adebayo’s federalism gamble: States to become development engines, not Abuja’s dependants

Presidential candidate of the Social Democratic Party, SDP, for...

Marks inaigurates ADC reconciliation committee, begs aggrieved members to give peace a chance

By Lateef Ibrahim, Abuja Ahead of the next year's general...

Turaki-led PDP mourns death of Dan Orbih

  By Lateef Ibrahim, Abuja The National Chairman of the Interim...

Wike rules out Atiku victory in 2027

By Stanley Onyekwere The Federal Capital Territory (FCT) Minister, Nyesom...