Power: ‘Why FG signed MoU with 3D Hitech’

Date:

By Etuka Sunday

The federal government recently signed a Memorandum of Understanding with 3D Hitech System Ltd., and two other companies for additional 500 megawatts of electricity.

Speaking on the deal, the Chief Executive Officer, 3D Hitech System Ltd, Mr. Patrick Azi stated that the ground breaking ceremony for the 500MW gas fired turbine to be cited in Ajaokuta, Kogi State, will

soon be held and gave assurance of its installation within 6 – 9 months.

The agreement was signed with 3D Hitech System Ltd, SEPCOIII Electric Power Construction Corporation and CGC Nigeria Ltd, with a view to ensuring a boost in the generation and distribution of power supply in the country.

Also speaking, the Minister of Power, Prof. Chinedu Nebo at the ceremony urged the companies to deliver on their promise so as to beef up the level of power supply.

READ MORE  FIRS rewards MSME operator with N2m, car for tax compliance

According to him, “Nigerians are hungry for power and would still demand for more, even if the output of these MoU were doubled, tripled or quadrupled”.

Nebo commended the 3D Hitech system Ltd because of the capacity it has demonstrated in the test running of the 110MW of power it is currently working on, which will soon be commissioned, adding that the 500MW gas fired turbine to be cited in Ajaokuta would also go a long way in enriching the national grid.

The Minister, who stated that transmission was fast becoming a major bottleneck in the distribution of electricity, commended both the CGC Nig Ltd and SEPCOIII for their interest in financing and provision of transmission infrastructure, describing it as a move in the right direction.

READ MORE  Rabiu, BUA chairman, urges Nigerians to stay patient, says economy getting better

According to him, the money being injected into the area by private institutions will no doubt, go a long way to inject more life into the transmission network. He further assured them of necessary moral support and government backing in the realization of its mandate.

Also responding, the Managing Director, CGC Nig. Ltd, Li Xuhui, who stated that the company’s MoU was signed for the financing and execution of transmission projects, assured that it will work assiduously to ensure the funding is made available for the strengthening of the transmission network.

In the same vein, the Executive President, SEPCOIII, Zhang Hongsong, assured that the company will ensure that the supply, refurbishing and replacement of transmission materials are given top priority so that the goal of President Goodluck Jonathan’s Transformation Agenda is fully realized.

READ MORE  Rumours of Naira Devaluation false, unwarranted -CBN

 

Never miss a moment! Get the stories shaping Nigeria, delivered straight to your phone. Follow Peoplesdaily Newspaper on WhatsApp for breaking news, exclusive reports, and the headlines everyone will be talking about, before anyone else.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

Popular

More like this
Related

To prevent sudden death, oxygen should be mandatory in every Nigerian hospital

By Isaac Asabor   There is perhaps no greater medical nightmare...

FG seeks Nigerians’ input on 2027 finance bill, sets Sept 11 deadline

By Joy Baba-Yesufu   The Federal Government has invited Nigerians...

Nigeria Regains Global Investors’ Confidence as FTSE Restores Frontier Market Status — External Reserves Hit $53.11bn

...FTSE reclassifies Nigeria from September 21–NGX targets foreign capital,...

8 Tips for healthy eating

These eight practical tips cover the basics of healthy...