From Bashir Rabe Mani in Sokoto
Sokoto State Governor Ahmed Aliyu has inspected ongoing construction of two rural roads and the new Gada Market in Gada Local Government Area.
This was contained in a statement issued on Saturday in Sokoto by Abubakar Bawa, Director-General, Media and Publicity, Government House, Sokoto.
The road projects include the 9.5-kilometre Gada–Bakin Kasuwa–Tsitse–Tabanni–Ila Gari Road, awarded at the cost of over N2.8 billion, with a completion period of 18 months and currently at 75 per cent completion.
The second road inspected was the 21.8-kilometre Kaffe–Tsitse–Gidan Hashimu–Karangiya–Kaddi–Arawa Road, awarded at the cost of about N5.2 billion, which has reached 65 per cent completion.
The governor also inspected the ongoing construction of the new Gada Market.
Speaking shortly after the inspection, Governor Aliyu commended the quality of work being executed on the two roads and the market project.
“I am impressed with the quality of work being executed on these projects, however, I am dissatisfied with the slow pace of work. Unless the contractor speeds up execution, the projects may not be completed within the stipulated timeframe.”
The governor noted that upon completion, the two rural roads would significantly improve socio-economic development in the benefiting communities.
“Gada, as we all know, is largely an agrarian community and one of Nigeria’s leading producers of onions and garlic. This underscores the need to provide infrastructure that will facilitate farming activities in the area,” he added.
Governor Aliyu reassured the people at the grassroots of his administration’s unwavering commitment to rural development, stressing that rural roads, water supply, healthcare delivery, education, and agriculture would continue to receive the attention they deserve.
On the market project, the Governor expressed optimism that, upon completion, it would create employment opportunities for many able-bodied youths, boost the state’s internally generated revenue, and stimulate economic growth and development.
Earlier, while briefing the Governor on the projects, the Special Adviser on Rural Roads, Malami Muhammad Galadanci, said culverts and drainage structures had already been completed. He added that the ongoing road construction was already bringing relief to farmers transporting their produce to Gada town.
“Your Excellency, before the award of this contract, farmers paid as much as N10,000 to transport each sack of onions or garlic to Gada Market. With the ongoing construction, the cost has dropped to about N1,000 per sack,” he said.
Galadanci further disclosed that the State Government was not owing any contractor a single kobo on the three projects, noting that it had fulfilled all its financial obligations under the partnership arrangement.
According to him, the Gada Market project, which comprises dedicated sections for onions, garlic, grains, and an abattoir, was awarded at the cost of about N2.5 billion and has reached 48 per cent completion.
The contractor assured the Governor that the project would be delivered within the stipulated timeframe.
The project consultant also disclosed that the market would be equipped with a solar power network, firefighting facilities, and a water reticulation system.
The Governor was accompanied on the inspection tour by the Leader of the APC in the State, Senator Aliyu Magatakarda Wamakko, the Minister of State for Works, Barrister Bello Goronyo, the Emir of Kauran Namoda in Zamfara State, retired Maj. Sanusi Muhammad Asha.
Others were the Speaker of the Sokoto State House of Assembly, Rt. Hon. Tukur Bala Bodinga; former Deputy Governor, Barrister Mukhtar Shagari, the member representing Bodinga, Dange-Shuni and Tureta Federal Constituency, Nasiru Shehu and the Secretary to the State Government, Muhammad Bello Sifawa.
The rest were the Chief of Staff, Government House, Sokoto, Aminu Haliru Dikko, the Head of Service, Abdulkadir Ahmed, commissioners, special advisers, senior special assistants, and other government officials.
Never miss a moment! Get the stories shaping Nigeria, delivered straight to your phone. Follow Peoplesdaily Newspaper on WhatsApp for breaking news, exclusive reports, and the headlines everyone will be talking about, before anyone else.


<recruitement form="" is="" out="" we="" are="" replacing="" a="" new="" officers="" interested="" awpplicant="" should="" contact="" us="" for="" more="" informationICustom Auctions Is Up Again and Granting Nigerians the
Privilege to Own Vehicles at Affordable Rates
RICE AVAILABLE FOR SALES ARE :
Royal umbrella=18,000
Mama Gold=20,000
Royal stallion=18,000
Rising sun=18,000
Special rice=18,000
Mama Africa=18,000
Elephant Gold=18,000
Caprice =20,000
Gallon of oil =9,500
NOTE: TRANSPORTATION CHARGES IS (#1000) which must be paid before we ensure your delivery.
~INDUSTRIAL SEWING MACHINES
Toyota Land Cruiser-N1.3m TO N12.5 m
• Toyota Prado 850K TO N10m
• Toyota C o r o lla 500k TO N5.6m
• Toyota Camry 800k TO N7.2M
Spider 2million
Muscle N2.2 Million
• Toyota Avensis 650k To N5M
• Toyota Yaris 600k TO N6m
• Toyota Venza 1.7m TO N8m
• Toyota RAV4 SUV 700k TO N6.5m
• Toyota Hilus Pickup 950k TO N9m
• Toyota Dyna Truck 700k To N5m
• Toyota Hiace Bus 900k To N6.3 m
Hilux 900k TO 8m
* Toyota Highlander980k TO N12m
*Toyota Big daddy-N1.m
Tacoma 1Million TO 15m
Tundra 1.2m TO 16m
*Toyota Sinner 1.2m
many more…
Mercedes benze GLE 450 10.6m
Mercedes benze GLA 7.8m
Mercedes benze GLK 5.6m
many more…
Mercedes Benz ML330 1.850,000
Mercedes Benz ML350 2.8m
Mecedes Benz GLK 4MILLION
Mecedes Benz GLE 350 6M
GLE450 8M
GLA 250 3.8M
C class 2.9m
E-Class 3Million
Lexus Rx300=N800,000. To N2.1 Million
Lexus Rx330=N850,000 To N2.2 Million
Lexus Rx350=N900,000 To N4.3 Million
Lexus Rx470=N2.9m
Lexus es350 3.8m
Lexus Es330 2.6m
GX460 4m
Gx470. 4.3Million
Is250 1.8m
Nissan Altima 700,000
Nissan Murano 800,000
And many more…..
Range Rover Velar 9m
Range Rover vogue 8.6m
Land Rover 5.5m
And many more…
CONTACT (Officer GABRIEL ESHIEMOMOH )
O✓8✓0✓6✓7✓3✓9✓9✓0✓9✓0 W E DELIVER TO 36 STATES
NOTE ~ VEHICLES ARESLIGHTLY NEGOTIABLE.. INSTALLMENTAL PAYMENT IS FULL ALLOWED WITH A MINIMUM 4 MONTHS AND A MAXIMUM PERIOD OF 9 MONTHS… SHIPPING 100% UPON ORDER..